Projects

Our Work

From large-scale mining operations to civil infrastructure projects, we keep machines running and dirt moving across Western Australia. 

Our fleet of scrapers and heavy machinery have kept major projects moving for top contractors, delivering peak performance with minimal downtime.

Haul Road East (CSI Mining Services)

This large-scale project involved construction of autonomous haul routes for CSI road trains, directly subcontracted to Hytorque after our performance on the overpass job.
Scope:
  • Built 90km of Main Access Road and 150km of haul road
  • Topsoil stripping, unsuitable removal, and cut and fill of conditioned material
  • Grader trimming removal and borrow pit conditioning
  • Dust suppression and borrow pit conditioning with water carts
Hytorque services provided:
  • Built 90km of Main Access Road and 150km of haul road
  • Topsoil stripping, unsuitable removal, and cut and fill of conditioned material
  • Grader trimming removal and borrow pit conditioning
  • Dust suppression and borrow pit conditioning with water carts

NWCH SP5 – North West Coastal Highway Overpass

Hytorque supported the construction of a new overpass on the North West Coastal Highway (NWCH), enabling highway traffic to pass safely over Mineral Resources’ new haul road from Kens Bore to Onslow Port.
Scope:
  • Built a temporary bypass road to maintain NWCH traffic flow during construction
  • Carried out all overpass earthworks, including:
    • Topsoil stripping (20,000 BCM)
    • Foundation preparation
    • Conditioning of borrow pit material
    • Cut and fill operations (180,000 BCM placed in 4 separate lots — 2 north, 2 south of bypass)
  • Managed traffic control throughout the project
  • Coordinated with Main Roads WA inspectors for weekly checks on material quality and site safety
Hytorque services provided:
  • Built a temporary bypass road to maintain NWCH traffic flow during construction
  • Carried out all overpass earthworks, including:
    • Topsoil stripping (20,000 BCM)
    • Foundation preparation
    • Conditioning of borrow pit material
    • Cut and fill operations (180,000 BCM placed in 4 separate lots — 2 north, 2 south of bypass)
  • Managed traffic control throughout the project
  • Coordinated with Main Roads WA inspectors for weekly checks on material quality and site safety
Project resources:
  • 10 plant items
  • 2 vehicles
  • 10 Hytorque team members on site

Flying Fish Haul Road

Short-term haul road construction project for FMG’s Flying Fish site.
Scope:
  • Topsoil stripping and cut/fill to build autonomous haul road
  • On-site mechanical support for SRG fleet and Hytorque equipment
Hytorque services provided:
  • Topsoil stripping and cut/fill to build autonomous haul road
  • On-site mechanical support for SRG fleet and Hytorque equipment

Western Range Haul Road Construction

As part of Rio Tinto’s new Western Range development, Hytorque supported construction of a 30km haul road connecting a satellite pit to Paraburdoo mine.
Scope:
  • Topsoil stripping of approximately 800,000m³
  • Cut and fill shared with CPB’s dump truck fleet
  • Assisted site supervision with scraper haul circuit setup and material assessments
Hytorque services provided:
  • Topsoil stripping of approximately 800,000m³
  • Cut and fill shared with CPB’s dump truck fleet
  • Assisted site supervision with scraper haul circuit setup and material assessments

Western Range Camp Pad

Hytorque was engaged to build the Rio Tinto Western Range camp pad from the ground up using scraper operations.
Scope:
  • Full cut and fill of the camp pad site
Hytorque services provided:
  • Full cut and fill of the camp pad site

Access Road & Mine Plant Earthworks

Hytorque supported early earthworks on a remote mine development project.
Scope:
  • 40km access road topsoil strip
  • Topsoil strip of new mine plant area
Hytorque services provided:
  • 40km access road topsoil strip
  • Topsoil strip of new mine plant area

Cape Leveque Drain Works

Emergency drainage remediation works after wet season damage.
Scope:
  • Rebuilt 5m-deep washed-out drains along 90km of road
  • Carted conditioned material and filled to Main Roads specification
Hytorque services provided:
  • Rebuilt 5m-deep washed-out drains along 90km of road
  • Carted conditioned material and filled to Main Roads specification

Wedgefield Industrial Area – Stage 3

Full-scope civil earthworks for Wedgefield Stage 3, completed with a small, agile team.
Scope:
  • Earthmoving over a 5.5-day workweek schedule
  • Carried out all work from mobilisation to project completion
Hytorque services provided:
  • Earthmoving over a 5.5-day workweek schedule
  • Carried out all work from mobilisation to project completion

Koodaideri Rail Construction (Now Gudai-Darri Rail)

A year-long rail development project covering 90km of new line for Rio Tinto.
Scope:
  • Earthworks across two remote camp locations
  • Managed works in asbestos zones with strict safety procedures including weed and seed, asbestos-rated filters, and full PPE
Hytorque services provided:
  • Earthworks across two remote camp locations
  • Managed works in asbestos zones with strict safety procedures including weed and seed, asbestos-rated filters, and full PPE

Need the Right Team for Your Next Project?

Every project has its challenges. We make sure plant hire isn’t one of them.